LAX Terminal Core APM

Perspective views courtesy of AC Martin

The LAX Terminal Core APM project, currently under construction, will provide modifications and additions to Los Angeles International Airport (LAX) Terminals 5.5, 7 and the Tom Bradly International Terminal (TBIT) to integrate these existing buildings with the new Automated People Mover (APM) system. Most terminals are being raised so that the APM skybridges connect at the appropriate height; TBIT is also being expanded to the edge of the sidewalk, which increase both interior space and daylight. The project is part of the LAX Landside Access Modernization Program (LAMP).

ZCS is responsible for the required LEED Silver certification of Terminal 5.5 and TBIT, and for the CALGreen Tier 2 compliance of all three projects.

 

Services

2 LEED Silver certifications anticipated.
CALGreen Tier 2, 3 terminals.

 

Project Team

Client: AC Martin
Owner: Los Angeles World Airports (LAWA)
Design/Build Contractor
: Austin Commercial Limited Partnership (ACLP)
Architect: AC Martin
MEP: PBS Engineers

 
Previous
Previous

Flight 93 National Memorial

Next
Next

ROW DTLA